The grid must match the supply of electricity to demand at every moment. Battery energy storage stores power when it is plentiful and delivers it when demand is highest. That strengthens reliability, gets more out of existing power lines, and can help avoid costly grid upgrades that would otherwise fall on customers.
No. This is not a data center. Jupiter Power develops energy storage facilities, which deliver energy to homes, businesses, and all other users of the electric grid.
No. Kuna has another project of comparable size to Star Garnet. “Kuna BESS” is a 150 MW facility in downtown Kuna on S Swan Falls Road. It has been operational for over a year.
The facility will be located east of South Cloverdale Road near the intersection with Kuna Mora Road. Idaho Power has an existing electric substation at this location, where this facility will interconnect to the electric grid.
The project will use approximately 25 acres of a 103-acre parcel. Remaining acreage around the facility will continue to be used for farming both during and after construction.

Map above: The proposed location of the Star Garnet Energy Storage Facility.
The Project will include the following equipment and associated facilities:
- Lithium-ion batteries
- Battery energy storage system containers
- Thermal management systems for temperature control
- Fire detection and suppression systems
- Electric control equipment
- Power Conversion Systems (Inverters / transformers)
- Step-up transformer and project substation, including lightning protection, a control enclosure, and internal fencing
- Communications equipment
- A perimeter fence and security gate
- 138kV generator tie-line and utility interconnection
- Other facilities required for construction and operation of the Energy Storage Facility
The project is low-profile, not housed inside a building, and is well set back (more than 700-2000 feet) from the nearest residences. Final design will include fencing, landscaping, and screening intended to reduce views from nearby properties, subject to local requirements.
For a better idea of what the battery enclosures look like, please visit our company website at www.jupiterpower.io.
At Jupiter Power, safety is our top priority—for the community and for our team—through every stage of the project. During normal operations, the Star Garnet facilities will not produce fumes, pollution, odor, dust, or other off-site impacts to those nearby.
Jupiter Power uses only standardized, lab-tested and approved equipment, complies with all National Fire Codes, including standards specifically governing energy storage, and specifically engineers our projects so that in the extremely unlikely case of an equipment malfunction, any resulting event can be managed safely. To make that possible during operations:
- Each battery module is monitored 24/7 and is equipped with sensors, fire suppression systems and alarms.
- Every battery is individually tracked by advanced software to catch problems early.
- Enclosures are spaced deliberately to ensure that any potential fire would stay contained within a very limited area of the projects.
- The projects will be built to meet national Fire Code standards and will be tested to strict safety protocols developed by Underwriters Laboratories (UL), the world’s leading safety testing organization.
Jupiter has met with the Kuna Rural Fire District and will work closely with them and other emergency responders throughout the process of the projects’ design. Jupiter looks forward to continuing that coordination throughout the life of the projects, offering fire safety training opportunities and resources to support preparedness.
Bottom line: The Star Garnet facilities are designed with the highest safety standards, using cutting-edge technology, and with ongoing coordination with local first responders to ensure safe and responsible operations.
The Project will benefit residents and businesses by improving the power grid and supporting the local economy.
Battery energy storage is a proven technology that provides increased power to the grid and other grid management capabilities, like grid balancing through instantaneous battery energy storage response. With these capabilities, the Project will deliver more reliable power for residents and businesses—all without building new transmission infrastructure, which ratepayers would have to fund.
The Project would represent a significant financial investment in Kuna. The Project will generate local tax revenue for the municipality for the life of the project. It will also create construction jobs and local sales tax benefits during construction.
We’re projecting to start construction in 2030 and be in service in 2031.
Please send a message via the Contact page on this website.